Residential · Walthamstow, London E17

Marrow Lane Terraces

Fourteen homes on a former builders' yard, arranged around one shared courtyard rather than fourteen separate back gardens.

Type
14 homes and a workshop unit
Area
1,340 m²
Client
Lea Bridge Developments
Contract
Design and build, architect novated
Structure
Loadbearing masonry, precast lintels
Completed
September 2024
The shared courtyard at dusk: white rendered walls, black-framed windows, gravel underfoot and warm light from a ground-floor room

The project

A small London developer bought a landlocked builders' yard behind a Victorian terrace and came to us with a scheme from another practice for nine flats in a single block. It had been refused. The objections were about overlooking, refuse strategy and the loss of a locally valued workshop use.

We tested six alternatives and took the least obvious one forward: two facing terraces of houses and maisonettes, three storeys, with a single generous courtyard between them doing the work that fourteen small gardens would have done badly. The density went up, not down, and the objections fell away.

The scheme completed in phases through 2024. Eleven of the fourteen homes were sold before completion, and the courtyard is now managed by a residents' company set up during the planning process.

Objectives

  1. 01Rescue a refused site without reducing the number of homes the developer needed to make it viable
  2. 02Answer the overlooking objection from the Victorian terrace backing on to the site
  3. 03Replace the lost workshop with a usable ground-floor commercial unit rather than a token gesture
  4. 04Design homes that would meet the London Plan space standards comfortably rather than exactly
  5. 05Keep cars off the courtyard entirely and design refuse and cycle storage in from the first sketch

Photographs of Marrow Lane Terraces

A living room in one of the two-bedroom homes, with white blinds, a leather sofa and low afternoon sunlight
A living room in one of the two-bedroom homes, with white blinds, a leather sofa and low afternoon sunlight
A recessed front porch with a pale timber door, beige stone steps and a potted plant in tree shadow
A recessed front porch with a pale timber door, beige stone steps and a potted plant in tree shadow

Design approach

The plan turns the problem inward. Both terraces face the courtyard, so the windows that matter look at each other across a 17-metre gap rather than over the neighbours' gardens. The elevations to the site boundary carry only high-level or obscured glazing, which we set out in a window-by-window overlooking study submitted with the application.

Each home has its own front door on the courtyard, reached across a shallow recessed porch with a step and a planter. That porch is the whole social device of the scheme: it is deep enough to stand and talk in, and it gives each household a threshold that is theirs before the shared ground begins.

Construction is loadbearing masonry with precast concrete lintels, chosen because the developer had a reliable local bricklaying gang and because it let us cast a shallow diamond relief into the lintels as the one piece of ornament in the project. The relief is the only decorative move and it is repeated fourteen times.

Scope of our appointment

  • Full architectural service, RIBA Stages 1 to 6
  • Site capacity study and six-option appraisal for the developer
  • Planning application including daylight, sunlight and overlooking assessments
  • Consultation with the neighbouring residents' association across three meetings
  • Building regulations and Part M accessible-home compliance
  • Employer's agent coordination under a design-and-build contract
  • Courtyard landscape design and the residents' management framework

Timeline

  1. Feb – May 2021

    Stage 1 · Capacity and options

    Six site strategies tested against viability, daylight and the planning history. Two-terrace courtyard scheme selected with the developer.

  2. Jun – Oct 2021

    Stage 2 · Concept and consultation

    Three meetings with the neighbouring residents' association, window-by-window overlooking study, pre-application advice from Waltham Forest.

  3. Nov 2021 – Jul 2022

    Planning determination

    Application submitted November 2021, determined at committee July 2022 with officer recommendation to approve and no sustained objection.

  4. Aug 2022 – Mar 2023

    Stage 3–4 · Technical design

    Design-and-build tender, novation to the contractor, and our retained role reviewing contractor's proposals against the employer's requirements.

  5. Apr 2023 – Sep 2024

    Stage 5–6 · Construction and handover

    Built in two phases so the first terrace could be occupied while the second finished. Final handover September 2024.

Close detail of a precast concrete lintel cast with a shallow diamond relief
Close detail of a precast concrete lintel cast with a shallow diamond relief

Outcomes

  • Fourteen homes consented on a site previously refused for nine
  • Every home exceeds the London Plan minimum internal area, by between 4 and 11 per cent
  • Eleven homes sold off-plan or before practical completion
  • No objections sustained at committee from the neighbouring terrace that had opposed the earlier scheme
  • The ground-floor workshop unit was let to a furniture maker before the second phase completed

We came to Archway with a refused scheme for nine flats and asked them to make it acceptable. They came back with fourteen homes and a recommendation to raise the density, which is not what you expect to hear after a refusal. They then sat through three meetings with the neighbours who had objected. It went to committee with no sustained objection.

David Ogundele · Director, Lea Bridge Developments